BCHD & PMB LLC PROPOSE OVERSIZED COMMERCIAL BUILDING
For some reason, unknown to Taxpayers, BCHD has always blindsided the public with revised plans for the proposed, privately developed/owned/operated 300,000 sqft, 110-ft tall proposed COMMERCIAL building project. BCHD has 0% ownership.
And while the neighborhoods are ignored by BCHD - BCHD continues to operate in the shadows with PMB LLC, the private developer/owner/operator of the project.
BCHD AND PMB OPERATE IN THE SHADOWS AND DENY TAXPAYER-OWNER RIGHTS
CEO Bakaly has decided that BCHD is a developer, like any other, and that the Taxpayer-Owners that OWN BCHD have no right to participate in the process. Taxpayer-Owners can wait until after BCHD has spent hundreds of thousands more of our tax dollars to file its application at the City of Redondo Beach.
2022 Dec - “What we have is a Master Plan. Let’s reserve judgment until everyone sees what it is exactly we are applying for,” Bakaly said.
Current - BCHD is working with WRC PMB Redondo Beach, our partner for the development and the operation of the Campus, to refine the Phase 1 campus plans and finalize our application for a conditional use permit with the City of Redondo Beach. This is expected in the next 3-6 months. Similar to other projects that apply for a conditional use permit, the public will be able to access the plan when it is submitted to the City.
TAXPAYERS OWN BCHD. IT'S OUR APPLICATION! The documented history of BCHD's blindsides are below:
BCHD BLINDSIDES THE PUBLIC REPEATEDLY
BCHD Commits to Buffer Zone
2017 May - BCHD Committed to a buffer of greenspace and parking around the core development (CWG Pres, Pg. 25/29)
BCHD Abandons Buffer Zone
2017 Jul - BCHD unveiled proposed illegal 6-level, lot filling concept for use of the C-2 zoned lot at Flagler & Beryl (CWG Pres, Pg. 15/18)
2017 Aug - BCHD shows 7-story building along the north lot line from Beryl to Flagler lot (CWG Pres, Pg. 7/23)
2017 Aug - BCHD shows at least a 4-story building on the corner of Prospect & Diamond (CWG Pres, Pg. 17/23)
2019 BCHD BLINDSIDE- THE GREAT WALL OF REDONDO
2019 Jan - BCHD unveils 60-foot tall (90-feet above surrounding homes) plan that has 0% buffer. Plan is built all along the north, east and south perimeter against residential homes. (CWG Pres, Pg. 12/51)
2020 BCHD BLINDSIDE - NEW TALLER DESIGN WITH MORE SURFACE BUILDINGS
2020 Jun - BCHD unveils new, taller design on Friday night after hours. 76-feet tall (106-feet above surrounding homes). Removes 160,000 sqft of underground parking and adds an 8-10 story parking ramp at Prospect & Diamond. (BCHD Email, 6/12/2020 @605PM)
2020 Jun - After only 3 business days of public comment, BCHD approves plan for never before seen, taller and bigger surface buildings design. (BCHD BoD Meeting, 6/17/2020)
2021 BCHD BLINDSIDE - FROM 76-FEET UP TO 103-FEET TALL
2021 Mar - BCHD's Draft EIR proposes to increase the building height to 103-feet (133-feet above surrounding homes) with absolutely no public notice nor input. (BCHD DEIR, March 9, 2021)
2022 BCHD BLINDSIDE - 107.5-FEET TALL (as listed by BCHD)
2022 Feb - BCHD's pre-CUP filing shows the building height at 107.5-feet above surrounding homes. The poor quality BCHD filing was extensively marked up by City staff. (BCHD Pre-CUP, Feb 2, 2022 document date)
BCHD and PMB LLC have been attacking the surrounding neighborhoods with their oversized commercial building and it must STOP! StopBCHD@gmail.com for info or to sign up for emails.